ITEMS PENDING
- Flooring in Front Entrance (Tim
Collins (American Floors). (Should Finish in three weeks, baring mold.). Paid in
full. Almost done. Call Lynn re cost of substraite. (ALMOST)
- Fireplace R&R.
- Chimney Sweep (Randy) flue OK and reinstalled cap. DONE)
- Broken Class to Martin Glass. Paid in
Full. (7-10 Days)(Cindy). Needs to be installed. (ALMOST)
-
Paint the exterior (Nick)
- Rehab Interior (Hearthside) (two to three weeks).
(Approximately $95.)
-
Two Windows (Downstairs and Master Bathroom)
Bid from Doug Crandall, A M Richards Glass, (636) 757-1300. Agreed and Down Payment
Made ($342.60 and first payment of ~$171.30). (Came by to Install Mon 31
July. Need to reschedule.) (ALMOST)
-
Electrical Work.
- Major rewiring should close up on Tuesday.  DONE
- Installation of fan needed in downstairs
bathroom (Cedric?) CRK Call Cedric after Nick confirms.
- Pick up
Bagster Bag. Call Made. Scheduled for Monday, Tuesday or Wednesday.
(DONE)
- Reschedule Home Inspection.
(Pending)
INTERIM PLANNING
- Paint the Front Door Frame, outside.
-
Paint the Hallway Entrance Ceiling. (Out for bid?)
Paint mold on wall near dehumpty. Kills type paint.
-
FUTURE PLANNING
- Fix Doorbell. Options are Cedric examines, and if that doesn't work, we buy a wireless substitute.
- Replacement of
burned
out
Halogen Flood Lights outside garage back
door.
-
Are shower doors working? Nick inspect and report.
-
Decide on method of doing lawn. Options include Cindy, Tim the Yard
Guy, or hiring out to someone else.
-
Buy Weed Wacker. DONE. Delivered Thursday last week. (DONE).
-
Cindy purchased lawn mower (reel) so doing herself. (DONE)
-
What is that second switch in the upstairs hallway, outside
Nick's bedroom.
-
Put hose in dehumpty.
-
Fix the Sump Pump. Not right away.
-
Fix Attic Fan. Not right away.
-
Replace towel rack in Main Bathroom.
-
Reverse light switches in main bathroom (move main too left and two small to right)(ergonomics)
-
Fix the main bathroom toilet so one
movement of handle is sufficient to
drain the tank. (Some plummer).
 
CALENDAR
Sunday, 30 July, through Saturday, 5 August 2017.
SUNDAY
COMMON:
NICK:
Other Duties as Assigned.
MARTHA:
Play for 0900 and 1130.
CRK:
Count Money.
MONDAY
COMMON::
NICK:
Other Duties as Assigned.
MARTHA:
CRK:
TUESDAY
COMMON:
NICK:
Other Duties as Assigned.
MARTHA:
CRK:
WEDNESDAY
COMMON:
Get Meds at Hanscom.
NICK:
Other Duties as Assigned.
MARTHA:
CRK:
THURSDAY
COMMON:
Medical Appointment, Martha.
NICK:
MARTHA:
CRK:
FRIDAY
COMMON:
NICK:
Other Duties as Assigned.
MARTHA:
CRK:
SATURDAY
COMMON:
NICK:
Other Duties as Assigned.
MARTHA:
Martha Plays for Four.
CRK:
Last Updated 02/1400EDT August 2017.